Friday, November 11, 2011

11.11.11

eden project, happy two years old!

Monday, November 9, 2009



Model Photos

Thursday, November 5, 2009

to do

1. powder model - fix and spray

2. powder model - foam core base

3. powder model - card-cut (?) surrounding built form

4. fabric model - laser cut perspex box and room cut-outs

5. fabric model - stitch and pull

5. 30 second 'fly-through'

6. 30 second maya animation

7. section

8. text.

9. interior render - library

10. interior render - studio

11. interior render - workshop

11. interior/exterior render - catwalk?

12. exterior render - aerial

13. exterior render - cafe

Thursday, October 29, 2009

to do list (updated 31 oct 1800hrs)


1. 1:200 Plan interior F1

2. 1:200 Plan Lower ground floor (services, lower theatre)

3. 1:200 Roof plan

4. 1:500 Site Plan (incl landscaping, car park, road paths) S1

5. Program plan (5 pages, each page with close up crop plan of one space)

6. Form diagram Roof -animation screencap F

7. Form diagram Floor -animation screencap F

8. Form diagram site strategy C

9. Landscape diagram ANALYSIS F & C3

10. Landscape diagram EXECUTION F & C

11. Building Section C

12. Building detail section C2

13. Site analysis (diagram of open spaces - establish along yarra banks, the open and closed spaces) C1

14. Thesis on Demolition - Fed Square (Gas and Fuel Building)

15. Thesis on Demolition - High wat on flinders st

16. Thesis on Demolition - ?? S2

17. REDO Programmatic Diagram F2

18. REDO Programmatic Logic

19. RENDER Aerial

20. RENDER Street view from Batman Park

21. RENDER from bridge (intersection)

22. RENDER from under bridge

23. RENDER Interior Studios

24. RENDER of Cafe

25. RENDER of Library

26. design elevation of parti wall with existing openings indicated

27. flow chart